- Nome del progetto:
- Mustla Bridge
- Luogo:
- Estonia
- Periodo di costruzione:
- 2019
- Progettista:
- Geoman Ltd.
- Descrizione del progetto:
- Reinforced Earth retaining structure using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 44,5m
Height (including base block): 4,6 m
The Redi-Rock PC is a reinforced earth retaining wall solution based on the standard Redi-Rock segmental mass-gravity system. A 300mm wide strip of geogrid is pulled through the core of the block and is laid with a layer level with the base of the block and one at the top. Any tension is balanced by that in the other layer, preventing the grid from being pulled through the block. This creates a strong, consistent facing connection that does not vary in capacity with depth. - Software:
-
GEO 5 - Muri Redi-Rock
- File:
-
redi-rock-wall-estonia-bridge-abutment.pdf
Redi-Rock Wall - Mustla Bridge Abutment Design, Estonia
Project Gallery Leaflet - Mustla Bridge Estonia
Metro Line C, Prague, Czech Republic
- Nome del progetto:
- Construction of Metro Line C
- Luogo:
- Prague - Ladvi - Letnany, Czech republic
- Periodo di costruzione:
- 2002–2007
- Progettista:
- METROPROJEKT Praha, a. s.,
Ing. Jaroslav Kopecny - Software:
-
GEO 5 - Progetto Paratie
GEO 5 - Verifica Paratie
Project Gallery Leaflet - Prague Metro line C
Concrete sewer, Slatina, Romania
- Nome del progetto:
- Concrete sewer - Slatina
- Luogo:
- Slatina, jud. Olt, Romania
- Periodo di costruzione:
- 2014
- Progettista:
- Proexrom, Romania
- Software:
-
GEO 5 - Pareti Chiodate
Project Gallery Leaflet - Concrete Sewer
Nádraží Veleslavín Station, Prague, Czech Republic
- Nome del progetto:
- Nádraží Veleslavín Station, Metro V.A, Prague
- Luogo:
- Prague, Czech Republic
- Periodo di costruzione:
- 2011 - 2014
- Progettista:
- Metroprojekt Praha a.s.
Ing. Martina Urbánková - Descrizione del progetto:
- Three-aisled station
Length: 100m
Maximum width: 22.34 m
Maximum height: 10.25 m
Side of the excavation area 70.6 m2
Secondary excavation area 42.9 m2 - Software:
-
GEO 5 - FEM
Project Gallery Leaflet - Nádraží Veleslavín Metro Station
Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road, Saudi Arabia
- Nome del progetto:
- Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road
- Luogo:
- Saudi Arabia
- Periodo di costruzione:
- 2017-2018
- Progettista:
- Civil Engr. Al-Hussain Hassan
- Descrizione del progetto:
- Tunnel Length:650 M
Depth of excavation: 15.0m
Number of rows of anchors: 5
Distance between anchors: 3.0m
Contractor: Jeddah Foundation Company - Software:
-
GEO 5 - Verifica Paratie
Bridge “Las Ferias Av”, Venezuela
- Nome del progetto:
- Bridge “Las Ferias Av”
- Luogo:
- Valencia City, Venezuela
- Periodo di costruzione:
- 2015
- Progettista:
- Sismica C.A. Ing. Edinson Guanchez (Msc, Esp)
- Descrizione del progetto:
- Total Deck Length = 139 m (4 spans)
Maximum span length = 36 m
Access Ramps Length = 250 m
Total Bridge Length = 389 m - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Terre Armate
GEO 5 - Spalle da Ponte
GEO 5 - Pali
GEO 5 - Gruppo di Pali
- File:
-
additional-description-and-drawings.pdf
Deep Excavation in Prishtina, Kosovo
- Nome del progetto:
- Deep Excavation - Anchored Diaphragm Wall
- Luogo:
- Prishtina, Kosovo
- Periodo di costruzione:
- 2018
- Progettista:
- "Geotest Engineering", Prishtinë
Dr. Ing. Qani V. Kadiri
Ing. Adrian Kadiri - Descrizione del progetto:
- Depth of excavation: 19.5m
Thickness of diaphragm wall: 0.6m
Number of rows of anchors: 5
Distance between anchors: 2.5m
- Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Verifica Paratie
- File:
-
deep-excavation-in-prishtina.pdf
12-meter high Gabion Wall, Mexico
- Nome del progetto:
- 12-meter high Gabion Wall
- Luogo:
- Guanajuato, Gto. México
- Periodo di costruzione:
- 2015
- Progettista:
- Ing. Pedro J. Villarreal Pinzón
TREE CONTACTO S.A. DE C.V. - Software:
-
GEO 5 - Gabbioni
- File:
-
PDF - GEO5 - Gabion report
Athienou Sewage Treatment Plant and associated works, Cyprus
- Nome del progetto:
- Athienou Sewage Treatment Plant and associated works
- Luogo:
- Cyprus
- Periodo di costruzione:
- 2015 - 2017
- Progettista:
- Ioannis Pericleous, MSc, CEng, MIStructE
- Descrizione del progetto:
- The project was a Design, Build, Operate contract and it included a sewage treatment plant with RC water tanks, one water retaining earth lagoon with capacity 100.000m3 and one 3.000m3. Project also included the design of several other associated works, such roads, 4no. Pumping stations located in Athienou community approx. 8m deep each, building irrigation network, etc.
- Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Cedimenti
-
Line 4 Metro, Budapest, Hungary
- Nome del progetto:
- Budapest Metro Line 4
- Luogo:
- Keleti Railway Station - Budapest, Hungary
- Periodo di costruzione:
- 2007
- Progettista:
- Goda Balázs, Honti Imre, Huszka Gábor Főmterv Zrt.
- Software:
-
GEO 5 - Verifica Paratie
Office buildings, Madrid, Spain
- Nome del progetto:
- Construction office buildings “Quinta de los Molinos”
- Luogo:
- Madrid, España
- Periodo di costruzione:
- 2004-2005
- Progettista:
- Daniel Danés Grases
- Software:
-
GEO 5 - FEM
GEO 5 - Pareti Chiodate
Drilled piles, Brasilia, Brazil
- Nome del progetto:
- Drilled piles
- Luogo:
- Brasilia, Brazil
- Periodo di costruzione:
- 2003–2005
- Progettista:
- Renato P. Cunha, MSc, PhD
- Software:
-
GEO 5 - Progetto Paratie
GEO 5 - Verifica Paratie
Gabion revetments, Ostrowo, Poland
- Nome del progetto:
- Gabion revetments – Jastrzębia Góra – Ostrowo
- Luogo:
- Jastrzębia Góra – Ostrowo, Poland
- Periodo di costruzione:
- 2012
- Progettista:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Software:
-
GEO 5 - Gabbioni
- File:
-
geo5-report-ostrowo.pdf
High-rise building, Istanbul, Turkey
- Nome del progetto:
- High-rise building
- Luogo:
- Istanbul, Turkey
- Periodo di costruzione:
- 2007
- Progettista:
- NYS Project Consultancy and Constracting Co.
Ing. Yavuz Seymen - Software:
-
GEO 5 - Progetto Paratie
GEO 5 - Verifica Paratie
High-rise building Soyak, Istanbul, Turkey
- Nome del progetto:
- High-rise building Soyak
- Luogo:
- Istanbul, Turkey
- Periodo di costruzione:
- 2011-2012
- Progettista:
- NYS Constructıon
- Descrizione del progetto:
- Excavation depth: 32,5m
Piles installed: 10,700m
Anchors installed: 71,000m
Soil excavation: 205.000 m3 - Software:
-
GEO 5 - Verifica Paratie
Kanianka dam, Slovakia
- Nome del progetto:
- Kanianka dam
- Luogo:
- Town of Kanianka, Slovakia
- Periodo di costruzione:
- 2004
- Progettista:
- Overall verification: Ing. Andrej Kasana
- Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - FEM
New Connection, Prague, Czech Republic
- Nome del progetto:
- New Connection Prague
- Luogo:
- Prague Main Station - Masaryk’s Station – Liben - Vysocany, Czech republic
- Periodo di costruzione:
- 2004–2010
- Progettista:
- Ing.Miroslav Sedivy
- Software:
-
GEO 5 - FEM
Pedestrian tunnel, Gdansk, Poland
- Nome del progetto:
- Pedestrian tunnel – Gdansk
- Luogo:
- Gdańsk, Poland
- Periodo di costruzione:
- 2013
- Progettista:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Software:
-
GEO 5 - FEM – Tunnel
Q22 Excavation Pit, Warsaw, Poland
- Nome del progetto:
- Q22 Excavation Pit, Warsaw, Poland
- Luogo:
- Warsaw, Poland
- Periodo di costruzione:
- 2013 - 2016
- Progettista:
- Buro Happold Polska Sp. z o.o.
Maciej Sobotkowski, MSc. Eng.
Zbigniew Czajewski, MSc. Eng. - Descrizione del progetto:
- 155 meters high office building with 5 underground levels. The depth of the excavation pit is more than 20 meters.
- Software:
-
GEO 5 - Verifica Paratie
Retaining walls RediRock, Newport, USA
- Nome del progetto:
- Sanville memorial public works facility
- Luogo:
- Newport, USA
- Periodo di costruzione:
- 2008
- Progettista:
- Souhegan Valley Engineering Inc.
New Hampshire, Newport USA - Software:
-
-
Shopping Center and Housing Project, Antalya, Turkey
- Nome del progetto:
- Shopping Center
- Luogo:
- Antalya, Turkey
- Periodo di costruzione:
- 2009-2010
- Progettista:
- NYS Constructıon
- Descrizione del progetto:
- Excavation depth: 24m
Bored Piles installed: 18,000m
Anchors installed: 108,000m - Software:
-
GEO 5 - Verifica Paratie
Temporary containment of terrain, Tenerife Norte, Spain
- Nome del progetto:
- Temporary containment of terrain
- Luogo:
- Valle Colino, Tenerife Norte, Spain
- Periodo di costruzione:
- 2006
- Progettista:
- Francisco Javier Cruz García
- Software:
-
GEO 5 - Pareti Chiodate
Tesare dam, Tesare, Slovakia
- Nome del progetto:
- Tesare dam
- Luogo:
- Town of Tesare, Slovakia
- Periodo di costruzione:
- 2004
- Progettista:
- Overall verification: Ing. Andrej Kasana
- Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - FEM
Tunnel ventilation access, Lérida, Spain
- Nome del progetto:
- Tunnel ventilation in AVE and Lérida access
- Luogo:
- Avenue Once de Septiembre, Lérida, España
- Periodo di costruzione:
- 2008
- Progettista:
- Ignacio Zuloaga
- Software:
-
GEO 5 - FEM
VMO Dobrovského, Prague, Czech Republic
- Nome del progetto:
- VMO Dobrovského Brno
- Luogo:
- Road I/42 Brno, Czech republic
- Periodo di costruzione:
- 2002–2005
- Progettista:
- Ing. Jaroslav Lacina
- Software:
-
GEO 5 - FEM
Waterworks Hosterwitz, Dresden, Germany
- Nome del progetto:
- Waterworks Hosterwitz
- Luogo:
- Dresden - Hosterwitz, Germany
- Periodo di costruzione:
- 2012
- Progettista:
- G.E.O.S. Ingenieurgesellschaft mbH
Dipl. – Ing. Juraj Ortuta, Dipl. – Ing. Andreas Köhler - Descrizione del progetto:
- Safety assessment of complex of buildings for planned increase of flood control waterworks Hosterwitz.
- Software:
-
GEO 5 - FEM
Newry, Ireland - Dominican Chapel, Ireland
- Nome del progetto:
- Newry, Ireland - Dominican Chapel
- Luogo:
- Newry, Northern Ireland
- Periodo di costruzione:
- 2017
- Progettista:
- Geoman Ltd.
Liam K.D. - Descrizione del progetto:
- Landscaping by MacWall system with NFC Fill.
Wall height: from 1.8 m to 3.6 m
Total number of walls: 5
- Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Terre Armate
- File:
-
PDF - Additional information about the project (detailed description, photos, documentation)
El Cerrillo Park Comenar Viejo, Spain
- Nome del progetto:
- El Cerrillo Park Comenar Viejo
- Luogo:
- Madrid, Spain
- Periodo di costruzione:
- 2019
- Progettista:
- Wall Designer: Geoman Ltd.
Redi-Rock Supplier: Memorial Parks - Descrizione del progetto:
- Reinforced retaining wall using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 70,2m
Max. height: 5,02 m
GEO5 Prefab Wall was used to assess the suitability of sheets of Geotextile reinforcement with a friction connection between blocks when the walls surpassed achievable heights using mass gravity, the Redi-Rock Wall module was used for standard Gravity analysis while the Stability Module provided global analysis for all sections considered.
The wall was founded on competent medium-dense granite sand and designed using the Spanish adaption of EC7 (UNE-EN 1997-1:2004) and associated annex.
The local soil group is described as Leptosols. The soil unit was described as Lithic and Dystric. - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Muri Prefabbricati
Brantham, Suffolk - Two reinforced walls, UK
- Nome del progetto:
- Brantham, Suffolk - Two reinforced walls
- Luogo:
- Brantham, Suffolk, UK
- Periodo di costruzione:
- 2021
- Progettista:
- Kenneth Knox, Stabilisure Ltd.
- Descrizione del progetto:
- Two 5.3m high, 70m long Rootlok hybrid nailed MSE walls at Stour view.
Number of rows of soil nails: 7
Nails distance: approx. 80cm
Total length of the supporting structure: 70m - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Terre Armate
- File:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Allenton, Derby - Ecocrib retaining wall, UK
- Nome del progetto:
- Allenton, Derby - Ecocrib retaining wall
- Luogo:
- Allenton, Derby, UK
- Periodo di costruzione:
- 2020
- Progettista:
- William Morrow (Geoman Ltd.)
Installer/ material supplier: PC Construction - Descrizione del progetto:
- Ecocrib retaining wall - 100% recycled mixed polymer retaining crib wall system.
Maximum retained height: 4.1m
Total length: 50m - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Muri Prefabbricati
- File:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Lawley Village Phase 10, Telford, UK
- Nome del progetto:
- Lawley Village Phase 10, Telford
- Luogo:
- Lawley Village, Telford
- Periodo di costruzione:
- 2021
- Progettista:
- Kenneth Knox
Geoman Ltd. - Descrizione del progetto:
- Height of reinforced slope: up to 6m
Total length of the slope: 300m
Slope stabilization technology: soil bag facing - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Terre Armate
- File:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Building of World Trade Center Asuncion
- Nome del progetto:
- Building of World Trade Center Asuncion
- Luogo:
- Asunción - Paraguay
- Periodo di costruzione:
- 2012
- Progettista:
- Ing. Augusto J. Leoni
- Descrizione del progetto:
- Pile curtain with not pre-tensioned (passive) anchors.
Depth of excavation: 16 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: 2.50 m - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Verifica Paratie
Expansion of shopping center Shopping del Sol
- Nome del progetto:
- Expansion of shopping center Shopping del Sol
- Luogo:
- Asunción - Paraguay
- Periodo di costruzione:
- 2014
- Progettista:
- Ing. Augusto J. Leoni
- Descrizione del progetto:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 to 18 m
Diameter of piles: 0,23 m
Piles spacing: 0,90 m
Number of rows of anchors: 4
Distance between anchors: Variable - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Verifica Paratie
Apartment house Eminent
- Nome del progetto:
- Apartment house Eminent - Asunción
- Luogo:
- Asunción - Paraguay
- Periodo di costruzione:
- 2015
- Progettista:
- Ing. Augusto J. Leoni
- Descrizione del progetto:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: Variable - Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Verifica Paratie
Paseo del Bajo parking in front of the Casa Rosada
- Nome del progetto:
- Paseo del Bajo parking in front of the Casa Rosada
- Luogo:
- Argentina - Buenos Aires
- Periodo di costruzione:
- 2019
- Descrizione del progetto:
- The construction pit is in close proximity to the historic sewerage system, which is more than 100 years old. The front of the excavation at a distance of only 6m from the sewer.
Depth of excavation: 10,5 m
Number of rows of anchors: 4
Distance between anchors: 2.50 m - Software:
-
GEO 5 - FEM
GEO 5 - Verifica Paratie
Design of a Rock Slope
- Nome del progetto:
- Design of a Rock Slope
- Luogo:
- Guizhou Province, China
- Periodo di costruzione:
- 2016 - 2017
- Progettista:
- Guizhou Metallurgical Design and Research Institute
- Descrizione del progetto:
- Rock slope stabilization using anchored reinforced concrete beams with two rows anti-slide piles at the lower edge of the slope.
- Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - FEM
GEO 5 - Strutture di Contenimento
- File:
-
Output protocol from the GEO5 Slope Stability program
Slope stabilization using three rows of Anti-slide piles
- Nome del progetto:
- Slope stabilization using three rows of Anti-slide piles
- Luogo:
- Jiangsu Province, China
- Periodo di costruzione:
- 2016
- Progettista:
- Geological Engineering Investigation of Jiangsu Province
- Descrizione del progetto:
- Slope stabilization with three rows of Anti-slide piles. Three separate series of stabilization piles: Pile diameter: 1m, 1m, 1.5m Pile depth: 9m, 11m, 15m Stabilization pile wall width: 19m, 27m, 33m Length of the stabilized part of the slope: approx. 120m
- Software:
-
GEO 5 - Stabilità dei Pendii
GEO 5 - Strutture di Contenimento
- File:
-
Output protocol from the GEO5 Slope Stability program
Shanghe Hanghu East Station - Retaining Wall
- Nome del progetto:
- Shanghe Hanghu East Station - Retaining Wall
- Luogo:
- Zhejiang Province, China
- Periodo di costruzione:
- 2014 - 2016
- Progettista:
- China Railway Siyuan Survey and Design Group Co., Ltd.
- Descrizione del progetto:
- Slope supporting structures at the railway corridor. Retaining reinforced concrete wall based on piles and reinforced MSE wall. Depth of foundation piles: 18.5 m Height of the reinforced retaining wall: 4.6 m Height of MSE wall: 4.6 m Number of rows of geo-reinforcements: 4 Reinforcement length: 4m
- Software:
-
GEO 5 - Terre Armate
GEO 5 - Muri a Mensola
GEO 5 - Pali
- File:
-
Output protocol from the GEO5 Cantilever wall and MSE wall program
Niuzhaishan Tunnel
- Nome del progetto:
- Niuzhaishan Tunnel
- Luogo:
- Fujian Province, China
- Periodo di costruzione:
- 2012 - 2014
- Progettista:
- Geological Engineering Investigation of Fujian Province
- Descrizione del progetto:
- The Niuzhaishan Tunnel in total length 1,697 m.
The double arc-tube highway tunnel will span four lanes in each direction.
Excavation tube width: 32 m.
Excavation tube height: 22,5 m. - Software:
-
GEO 5 - FEM
GEO 5 - FEM – Tunnel
GEO 5 - Stratigrafia
- File:
-
China Niuzhaishan Tunnel Output Report
Construction of Expressway S7, Poland
- Nome del progetto:
- Construction of Expressway S7, Koszwały-Nowy Dwór Gdański
- Luogo:
- Poland
- Periodo di costruzione:
- 2018
- Progettista:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Descrizione del progetto:
- Stabilization of the expressway subsoil using a group of piles.
Pile diameter: 0,40m
Number of drilled displament piles: 186000
- Software:
-
GEO 5 - FEM
- File:
-
poland-subsoil-stabilization-expressway.pdf